LUBBCOK, TX (KCBD) -
Broadway at Ave. O
will be closed for the next three weeks due to the
installation of the underground duct system downtown that began in March.
The through traffic will need to
detour to either Main Street or 13th Street. Local traffic will still have access
to the adjacent parking lots.
Copyright 2012 KCBD. All rights reserved.