TxDOT begins S. Loop bridge construction Wednesday - KCBD NewsChannel 11 Lubbock

TxDOT begins S. Loop bridge construction Wednesday

Posted: Updated:

Wednesday, TxDOT begins work on the southbound Loop 289 bridge.

The construction is part of a $26.9 million project to widen the Loop from Slide to Quaker into a six-lane freeway and improve frontage roads.

They will close north Quaker Avenue/TTU Parkway in both directions at northwest Loop 289. Motorists will not be able to access the Loop 289 intersection.

Drivers will need to use the frontage roads to connect with Slide Road or US 84.

Copyright 2013 KCBD. All rights reserved.

Powered by WorldNow

5600 Avenue A
Lubbock, TX. 79404

FCC Public File
publicfile@kcbd.com
806-744-1414
EEO Report
Closed Captioning

All content © Copyright 2000 - 2014 Worldnow and KCBD. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.