Road resurfacing to block off six major thoroughfares - KCBD NewsChannel 11 Lubbock

Road resurfacing to block off six major thoroughfares

Posted: Updated:

Starting on Monday, the city of Lubbock will begin applying micro-surfacing and cape seal on major thoroughfares in town.

For the next month, these six major thoroughfares will either be under construction or blocked off:

  • 82nd St. from Frankford to Elgin Ave.
  • 82nd St. from University to Ave. U.
  • University Ave. from 82nd to 98th St.
  • Indiana Ave. from the South Loop to 98th St.
  • Quaker Ave. from the South Loop to 82nd St.
  • University from the South Loop to 50th St.

The road work will happen in phases. However, during the four to six week process, the city of Lubbock urges drivers to allow extra time during your commute for delays, or to find an alternate route.

Copyright 2014 KCBD. All rights reserved.

Powered by WorldNow

5600 Avenue A
Lubbock, TX. 79404

FCC Public File
publicfile@kcbd.com
806-744-1414
EEO Report
Closed Captioning

All content © Copyright 2000 - 2014 Worldnow and KCBD. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.