New route to be presented at Lubbock Outer Route meeting - KCBD NewsChannel 11 Lubbock

New route to be presented at Lubbock Outer Route meeting

Provided by the Texas Department of Transportation

The Texas Department of Transportation (TxDOT) has scheduled its third open house and public meeting to discuss and receive input from the public on the second phase of the Lubbock Outer Route Study. The recommended route for the proposed facility will be presented.

“The preferred route we are proposing reflects modifications based on extensive public and stakeholder input over the past four months,” said Doug Eichorst II, P.E., Lubbock District Engineer. “Details of adjustments—made since the last public meeting—to three areas of the preferred route, including realigning the south portion of the proposed preferred route to follow FM 1585 instead of 146th Street, and realigning the southeast portion to follow 146th Street instead of FM 1585, will be presented during the final meeting.”

A stakeholders group, along with TxDOT engineering staff, considered results of traffic, societal, environmental and engineering criteria, as well as comments from their individual constituents and from the public meetings to determine the preferred route.

“We have been meeting with the Stakeholders Group and the public since June 2013, identifying concerns within the study area, reviewing technical information and route options, and gathering input and comments to refine the recommended and preferred routes,” Eichorst said. “This latest route minimizes the impact on surrounding properties.”

During the meeting, scheduled for Thursday, August 21, at the Lubbock-Cooper Performing Arts Center, 16302 Loop 493, Lubbock, 79423, TxDOT will seek public opinion on a Preferred Route for the proposed highway facility around Lubbock from US 84 northwest of Lubbock to US 84 southeast of Lubbock. An open house beginning at 5:30 p.m. will provide information and display exhibits related to the study area and preferred route. A short presentation by TxDOT personnel will be conducted at 6 p.m. Staff will be on hand to answer questions.

The first phase of the Outer Route development, known as the Feasibility Study, concluded in 2010 with a finding of feasibility for a four-lane divided highway in 2030. The second phase, known as the Route Study, has involved traffic, societal and environmental analyses and public input on preliminary and recommended route options. Stakeholder and public meeting summaries, as well as fact sheets and frequently asked questions, are posted on the project website.

Persons who plan to attend and have special communication or accommodation needs are encouraged to contact Dianah Ascencio at (806) 748-4472 at least five business days prior to the meeting to request assistance. TxDOT will make every reasonable effort to accommodate these needs.

  • Local News on KCBD.comNewsMore>>

  • Political end to Olympics: NKorea offers talks with US

    Political end to Olympics: NKorea offers talks with US

    Sunday, February 25 2018 2:16 AM EST2018-02-25 07:16:08 GMT
    Sunday, February 25 2018 4:37 PM EST2018-02-25 21:37:19 GMT
    (AP Photo/Patrick Semansky). A volunteer walks in a foggy Pyeongchang Olympic Plaza during the 2018 Winter Olympics in Pyeongchang, South Korea, Saturday, Feb. 24, 2018.(AP Photo/Patrick Semansky). A volunteer walks in a foggy Pyeongchang Olympic Plaza during the 2018 Winter Olympics in Pyeongchang, South Korea, Saturday, Feb. 24, 2018.

    Pyeongchang closes its chapter of the modern Olympics on Sunday night with tales of detente and competitive grit and volunteerism and verve.

    Pyeongchang closes its chapter of the modern Olympics on Sunday night with tales of detente and competitive grit and volunteerism and verve.

  • 5 dead after tornado, flooding from central US storms

    5 dead after tornado, flooding from central US storms

    Sunday, February 25 2018 2:25 AM EST2018-02-25 07:25:46 GMT
    Sunday, February 25 2018 4:36 PM EST2018-02-25 21:36:17 GMT
    (Liz Dufour/The Cincinnati Enquirer via AP). A view from the Central Bridge shows the flooding from the Ohio River  Saturday, Feb. 24, 2018 in Cincinnati.  Forecasters expected the Ohio River could reach levels not seen since the region's deadly 1997 f...(Liz Dufour/The Cincinnati Enquirer via AP). A view from the Central Bridge shows the flooding from the Ohio River Saturday, Feb. 24, 2018 in Cincinnati. Forecasters expected the Ohio River could reach levels not seen since the region's deadly 1997 f...

    A man in northeast Arkansas and a woman in south central Kentucky both were killed as the storm that also included strong winds, hail and heavy rain that triggered flooding muscled its way through the area, according to authorities.

    A man in northeast Arkansas and a woman in south central Kentucky both were killed as the storm that also included strong winds, hail and heavy rain that triggered flooding muscled its way through the area, according to authorities.

  • China paves way for Xi Jinping to extend rule beyond 2 terms

    China paves way for Xi Jinping to extend rule beyond 2 terms

    Sunday, February 25 2018 4:05 AM EST2018-02-25 09:05:47 GMT
    Sunday, February 25 2018 4:28 PM EST2018-02-25 21:28:02 GMT
    Chinese President Xi Jinping speaks during a joint press briefing with French President Emmanuel Macron, at the Great Hall of the People in Beijing, Tuesday, Jan. 9, 2018. (AP Photo/Mark Schiefelbein, Pool)Chinese President Xi Jinping speaks during a joint press briefing with French President Emmanuel Macron, at the Great Hall of the People in Beijing, Tuesday, Jan. 9, 2018. (AP Photo/Mark Schiefelbein, Pool)

    China's official news agency says the ruling Communist Party has proposed removing a limit of two consecutive terms for the country's president and vice president.

    China's official news agency says the ruling Communist Party has proposed removing a limit of two consecutive terms for the country's president and vice president.

Powered by Frankly