Crews place 45-ton truss at Buddy Holly Hall site
/cloudfront-us-east-1.images.arcpublishing.com/gray/TRUYRRSSTZDHNC3OUO6FYYODQ4.jpg)
Updated: May. 24, 2018 at 10:06 AM CDT
Thursday morning, crews from Lee Lewis Construction, Inc. lifted and placed a 155-foot, 145-ton steel truss at The Buddy Holly Hall of Performing Arts and Sciences.
According to the Lubbock Entertainment/Performing Arts Association, it's a space frame truss that will span across the entire lobby of The Buddy Holly Hall, supporting the roof structure.
The Buddy Holly Hall was designed in partnership with Toronto-based Diamond Schmitt Architects, Inc. and Lubbock-based architects MWM and Parkhill Smith & Cooper. Construction at the site began in May of 2017 and is expected to open in early 2020.
Copyright KCBD 2018. All rights reserved.